La Guinegueta

Promoter

BIMSA
Ajuntament de Barcelona

Authors

Territori 24

Location

Parc de la Guineueta, Barcelona

Project / construction year

2017-2021

Surface

2.000m²

Budget

2.653.301,04€

(vat included)

Cities connect project

Energetic and socially sustainable construction

The land where the performance is located is part of the site managed by CEM La Guineueta, on the same island as Parc de la Guineueta and in direct contact with it.

Energy saving and sustainability
A low-tech building is projected, based on a prefabricated system, which achieves high environmental efficiency based on strategies to reduce energy demand and use prefabricated economic structural and construction systems. Applying these criteria we manage to build a highly sustainable building without increasing the budget.

Based on advanced energy modelling, we dimension the elements and the system, to re-invest in renewable energy, the reuse of rainwater, plant cover and a system of solar tubes to reduce electricity consumption. The building consumes 48% less than a standard building and self-produces much of the energy consumed.